Thursday, September 28, 2017

Projects

Well, I got the toolshed shelves finished.  Sometimes you have to stop seeking perfection and "just do it"!

I got the shelves to match up in the corners.  The bottom left shelf ended up 1/4" out of level.  But its a 25+ year old shed, nothing about it is level or square anymore, and it needs a new roof.  So I'm not going to worry about it.
I had to put 2x4 boards behind the shelves to keep small items falling out the back (the sheves are on exposed 4" studs).  I would have used 1x4 boards, but I bought 10" wide boards instead of 12" wide boards and the brackets would have stuck out otherwise and not allowed me to use the front screw hole in the tip of the bracket.  A 10" bracket IS 10" long; a 10" board is only 9 1/2".
Just moving some pots to the new shelves gained me 16 sq ft of basement space, and I have lots of garden stuff still to move.  I expect to recover about 50 sq ft when I transfer more "stuff" from the basement to the shelves.  And there will be more shed floorspace  to store power equipment I seldom use (but use a lot when I need it) when I take small amounts of some stuff out of large boxes and add them to the shelves. 

That will make more sense when I fill the shelves and get some of the equipment stored in there.  I'll take pictures.

In 30 years, I've accumulated a lot of equipment.  Snow-blower, tiller, chipper/shredder, lawn-roller, aerator...

Those things are cluttering up the garage and the REAL shed.  Yes, I have 2 sheds.  More importantly though, it frees up room in the basement for woodworking, and I am determined to make the basement easier to do work in. 

And with Winter coming on, I have some wood-working projects in mind to occupy my time

1 comment:

Megan said...

Yaaaay! Well done you!

Megan
Sydney, Australia

Behind Yardwork

I find it harder to do yardwork these days.  Bad knees, bad back, muscle cramps from gripping tools tightly...  I think I have pushed my bod...