Thursday, July 17, 2014

The Old Boat

Is gone! 

Well, one of the deck demolition guys saw my old jon boat sitting in the backyard full of leaves and asked if I ever used it.  Well, I haven't for 5 years.  So he made an offer, I made a counter offer, he made a 3rd, and I didn't care about the difference so we agreed on a price.  He got a good deal, but the boat wasn't doing me any good either just sitting around.

So he paid me half as a down-payment and I wrote out a receipt.  He came by Sunday with the remaining amount.  He's never had a boat before and is retiring this year.  Wanted a cheap boat to go fishing in.  I sold it "as is" which may get him in trouble.  "As Is" was boat, trailer, and an electric motor.  Nothing beyond that.

Still, the next morning, I decided I couldn't let the guy drive away with leaves blowing out the back, so I cleaned them out (have I already mentioned all this?) and used the garden hose to blast it as clean as I could.

Good thing, because I found 2 wasp nests in the bait well and they would have been really p*&&ed by all that bouncing on the road home.  I killed them, but I did have to dodge the ones who returned to their absent nests later.

 So yeah, it was "as is", but I decided to improve the "as is".

I even made sure the boat was still waterproof by filling it up 6" deep in water and waiting a day to see if there were any leaks.  There weren't.  Draining the boat was impressive, and the shrub behind it appreciated the deep watering..
It wasn't perfect when the guy returned, but he sure did appreciate the improvement.  But it allowed me to show him how some parts of the boat worked.  The bait well, for example has a drain below the water line.  But there is a pvc pipe that rises above that so outside water doesn't come in.  Onshore, you pull the pvc pipe and it drains.  That sort of non-obvious thing.

But it looked OK.
I hope he enjoys the boat.  I had it for 21 years, so I got my money's worth out of it and some cash back.  But it sure looks odd not seeing a boat in the yard...

Now I'm deciding which way to go on a new boat.  I DO plan to start fishing again.  I like stillwater freshwater fishing, so I might go for a squareback canoe (for attaching an electric motor).  But there are some slightly fancier boats for getting out on the calmer waters of the Potomac river.  I'll wait a while to decide.

Wednesday, July 16, 2014

Damnable But Small Problems

It's the smaller problems of life that get at you the worst sometimes.  I mean, Really Bad Problems, you know they are, and you have to deal with them.  Family members die, you break a bone, you lose a job.  Those are bad.  And everyone understands.

Its the smaller stuff that is sometimes harder to deal with, because you are all alone with it.  The splinter in your finger, the sore shoulder, the car that doesn't like to start, those don't get so much sympathy. 

I've been plagued with the latter recently.  I don't need much sympathy, but I DO want to gripe about them.  And its MY blog, so here goes (LOL)...

My left thumb is inept.  For years, I've had a spot I stuck with a thorn and it caused a tiny hard spot that just won't go away.  I keep noticing it with the index fingernail.  I've opened it a couple times with a sewing needle, but I can't get it to heal away.  And I cut the base of my right thumb years ago and it formed a hard spot there too.  I just keep noticing it when I grab things.  So when I got a half-inch splinter in That Left Thumb from the new deck I just got all freaked.  I couldn't get it out.  Turn the inside of your left thumb towards you and put the back down on a steady surface.  Now try to get at it with a needle and tweezers. 

Maybe I'm not as flexible as I used to be, but I just couldn't.  It took a week for the skin harden over the splinter like a callous, and I managed to loosen it after that.  Its healing fine.

But sometimes, it is just stuff like that over and over.  I damaged the left shoulder rotater cuff 10 years ago, and I thing I've done it again.  I don't even know specifically how or when I did it.  I just woke up one morning and OUCH!!!

My aging Mother used to say "getting old isn't for sissies".  Hmmm. I've been enough heavy work on my own for a long time and had a lot of "ouchies" (and enough "ARGGGHS" too), but they seem to be coming more often these days.  I hope I'm not becoming a "sissy".  But let's just say that I used up a tube of muscle rub ointment before the expiration date for the first time this year.

I wish that was the only problem.  I garden a lot and I get a lot of unwanted tree saplings that need to be dug out.  Usually, its not a problem.  Oh, work for sure, but I get them out.  Well, I was surprised this week. 

I am rebuilding my old rotting framed garden beds.  Aligned better to the sunlight, wider and higher, and to have a chicken wire enclosure to keep the varmints out.  Well, with the season moving on, I decided to redig the beds that will be outside the enclosure so that I could have some Summer plants growing (cukes, beans).  Meaning the old less-productive asparagus bed had to be dug up. 

There were 4 tree saplings I've been cutting back in there for several years.  So it was the right time to REALLY dig them out.  I couldn't.  I mean, I used the same techniques I always used before, but they just would yield!  I have tools.  A sharp all metal spade, an axe, a 5' pry bar.  I finally got one out and it about killed me...

Talk about realizing that you aren't 30 anymore...  I'd be happy to be 40 (I'm 64).  I did the sensible thing.  I left the other 3 in and planted around them.  Its just for a few months.  Come Fall, I will cover that bed with plywood and plastic and let them DIE next year.  All problems can be solved with time.

But I only mentioned all this to tell you about today's problem...

I have historically had basement water problems.  The old gutters filled with tree debris and would overflow onto the deck and then down to the sunken patio.  The patio had ground level drainage.  But over the years, the soil build up (fallen leaves, mowed grass) and formed a pool that build up to the level of the basement door.  Water got in.  I solved that temporarily by digging a ditch through the lawn downslope. 

In Fall 2012, I had the roof reshingled, new vinyl siding, and new larger gutters with debris-proof tops.  No more gutter overflow filling the basement patio!  Yeah.

Right...  With the new deck, there was a lot of digging involved.  Lots of soil moved around.  They did a good job moving the extra soil to a corner of the yard.  So far, so good.  What I didn't notice was that some of the extra soil got spread into the remnants of the patio drainage ditch.  So I had a 2" wall of dirt around the lawn connection to the patio.

It rained really hard today.  I was glad for the rain because it has been about 1/4" per week the past month.  BUT!  The rain that fell through the deck filled up the basement patio (I bet you saw that coming).  FORTUNATELY, I happened to go into the basement to get something and saw the rainwater seeping in.  I threw some old towels on it and went to the toolshed IN THE TORRENTIAL RAIN to get my grub-hoe.  Shovels work, but a grub-how makes a nice 4" wide and deep trench.  In the rain. 

Even with a raincoat on (and I wished I still owned a poncho) I was soaked to the skin just making a 4" wide and deep ditch from the patio downslope 12' long.  It was a pleasure seeing the water draining out in a rush...

But that is still a temporary fix.  I thought the bigger rain gutters would solve the problem, but with enough hard rain, even just the water falling through the deck will fill up the patio.

The real fix is to lower the level of the lawn where it meets the deck, AND installing a below-ground drainage system to move the patio water downslope.

More work.  Just what I needed.  And I'm sure not going to do THAT before my shoulder heals.  I'll just have to make sure the grub-hoe surface dug ditch stays clear for a while.

ARGGH!

And I won't even get into the new adult groundhog and rabbit I saw around the garden this afternoon.  Well, OK, I just did, but you know what I mean.

Sunday, July 13, 2014

One Last Thing

About the new deck.  They had to rush by on Tuesday before the INSPECTOR arrived because they forgot to add a handrail on the stairs.  So I tried it out.

Got a BIG SPLINTER in my left thumb.  &%*#  Couldn't pull it out.  Touchy-painful.  But I was patient.  I got it loose today, 5 days later.  What a relief...

And 2 days ago, I managed to wrench my left shoulder.  I can't even figure out when I did it.  Put there it is, all useless in some positions.  Its a little better today.  But if I extend it across my body and then use it to push away...  OUCH!!!

I do that to myself too often.  I suppose there will come a day when I do something like that and it won't just heal.  But that's not THIS time.  LOL!  Comes from living alone and having to do some things it really takes 2 people to do, I guess. 

Friday, July 11, 2014

Grafted Tomatoes Report

Complete Failure!  The idea I had read about was to graft heirloom tomato tops to hardier disease-resistant hybrid bottoms.  You cut a top and a bottom at an angle and use a flexible silicon tube/clip to hold them together while they join.  You keep them in a humidity container for a week or so to keep the tops hydrated until they are getting water and nutrients from the roots.

After a week, more than half the grafted tops had died.  After 2 weeks, I removed some of the clips, but the seemingly-healthy tops just fell off.  I had 5 left.  After 3 weeks, I went to transplant them and THOSE tops fell off.

Well, I'm sure most of that was my fault.  It is commonly done commercially and by home gardeners.  I know I waited too long to do the initial grafts.  The instruction said to do it "when there were 4 leaves" (the seedlings would be about 4" high).  Mine were 8" high with 8 leaves.

So I had to use the clips "wrong".  Think of an "8" (with a fatter bottom) with a slit cut through the top.  The top makes the clip part.  Squeeze the fat bottom of the "8" and it opens the top and you attach the 2 angle-cut tomato parts together.

Well, the clip part was too small by then but the fat round part was the right size, so I tried just putting the round part down over the rooted stem and then placing the cut heirloom top down in that.  I got them matched in size very well, put it didn't work.

I assume the seedling halves were too old to grow together properly.  Or the uncut round part constricted growth. 

I'll try again next year following the "4 leaves" instruction more carefully.  There are pictures of the initial grafting process HERE.

Fortunately, I made sure to plant enough seeds so that I had regular ungrafted heirlooms to plant out.  They are growing well and I have at least a dozen fruits among the 6 plants so far.  But the disease problems usually start in August, so we'll see if I get many ripe tomatoes.





Tuesday, July 8, 2014

Well, Its Over!

The inspector came.  He didn't seem like a happy person, so I told the builder I was just going to stand around and keep my mouth shut and hope for the best.

That lasted about 2 minutes.  But only becaue the inspector saw my tomato plants ad asked about them.  Me red, him green after here.

Nice tomatoes.
Yeah they're heirlooms  and doing very well after setting them out late.
You grow heirlooms?  Which ones?
Oh, Brandywine, Cherokee Purple, Prudens Purple, Striped German, and Aunt Gertie's Gold.
My dad liked Cherokee Purples a lot.
Best tomato ever!
You grow peppers?
Well, bell peppers, Lipstick.  Grows red fast.
Like Ace, right?
Yeah, Ace replaced Lipstick a few years go, but I still like Lipstick better.  Hard to find though.
Yeah, I remember Lipstick.  Dad switched to Ace,  Nice use of the recycling bins BTW.  
Yeah, I'm trying some  bicolor corn and leeks and and Russian fingerling  potatoes this year.
Are they good?
Yeah, I tasted one  from the box.  Better than Yukon Gold.

Etc etc, for about 30 minutes ...  Needless to say we passed inspection.  He loved my garden (and the deck was pass-worthy anyway).

The builder was amazed.  Apparently this inspector is "picky", and never talks to people, but made no complaints about the deck.  For once.  Cheers for heirloom tomatoes!
     
And I can't wait for the first ripe one.

But most importantly, no more stranger/visitors for a long time.  The backyard is OURS again!  I let the cats out promptly...

Now, if you will forgive me, I'm going to go stand out on my deck for a while.  And go to bed early; I was up all last night!


Monday, July 7, 2014

Some Embarassment

Have you ever listened carefully to someone and thought you understood that they said and were wrong?  AND thought of the situation logically and were wrong?  That happened to me about the leftover materials from the new deck today.

Well, see, there were chunks of wood and leftover pieces from the deck, and the construction foreman said I could keep anything I could use because it was all just going to the landfill.  Cool!

But then later it occurred to me I should be able to because I had paid for all that material in the price of the deck.  It's not like they brought leftovers from their last job here for free.  There were 6' pieces of 6'x6' posts, pieces of 2'x12 boards, and lots of cutoffs from the composite deckboards.  Best of all, there were two 20' and one 8' lengths of composite deck boards!

I should mention that the deck itself is composite boards, but the rest is standard pressure-treated wood.  And when the builder discussed the upper posts and railings, my choices were narrow pointy vinyl with a narrow top or pressure-treated wood 6" wide.  I like flat top rails to lean on and set stuff down on.

After the construction, it occurred to me that topping the flat railtop pressure-treated (P-T) wood with composite board would be a nice finishing touch.  And the other boards were the right size to frame a sloped area behind the new posts for a row of hostas under the shade of the deck.  The remaining "chunks" were good for surrounding some shrubs and filling with mulch to keep down weeds.  Etc.

I spent a hot sweaty day outside Sunday moving the stuff I wanted to keep to the edge of the yard away from the pile of debris to be removed so that it was separate from the debris I didn't want. 

So, when I saw the contractor hauling some of the boards back toward the front yard, I asked him why.  He said he could return them to the lumber store for credit.  I said I was told by his foreman that "what was left was mine".  He said that only applied to the cut-up stuff.  Dang!  I felt embarrassed. like I was trying to steal stuff.  He said not to worry, it was a common mistake. 

But I really did want that compsite board to cap the rail tops, so I offerred to buy those two 20' long boards.  Saves him having to return them and me having to go get new ones.  I agreed to add them to the final deck cost.  The long composite boards with bullnose (rounded) fronts are not cheap - $70 each. 

But I've been thinking about this.  It seems to me that I paid for all the material the builder brought to the job.  And its not the cost (after $16,000, what's another $140), but a principle here. 

The contractor didn't arrive here with any free leftovers from the last job.  So everything he had delivered here, he bought within the price of the contract and expected to use building my deck.  So it seems to me that all the materials brought to the site are ones I was charged for in the job quote.

So, aren't they mine?  So, if I pay this guy returns unused materials to the lumber store for credit, shouldn't he reduce me cost by that much?  Or leave me those materials at no extra cost.

I plan to ask him more about that tomorrow.  I'm not going to be loud or demanding, but I do want to understand this matter of materials a bit better.  Partly for now, but partly for the next contractor (and there surely will be a "next contractor" about "something" here (planning kitchen tile work and a bathroom repair job).

OK, be honest, I can handle it.  Am I wrong to fuss about whether I've already paid for the slight leftover onsite materials?  I won't hold any comments against anyone, I need some reality-check.  I'm just trying to decide if this leftover stuff was already mine.

It's not like I'm complaining about the deck at all... I LOVE the new deck!

Thanks in advance,

Mark


Friday, July 4, 2014

New Deck, Part 4

First, A recognition of Independence Day.  I go out on the deck and read The Declaration Of Independence out loud each year on this day.  It is a stirring document.  Last night, I saw someone on a political talk show who said the claim is at the end and the justification is before, so read it backwards that way. I get the idea, statement at the end and justification before.

So I did.  I have to admit, I thought about it a little differently.

And to my/our British friends, I hope there are no hard feelings.  We got off to a rocky start, but I think it has worked out pretty well over the past couple centuries.  My revolutionist ancestors would not have tipped their hats to you, but I can and do.

But we DO have our holiday and I will support it with a steak on the Japanese hibachi grill, a cold Canadian beer (or 3), a few Southeast Asian shrimp, and a German sausage.  What could be more "American" than that?  LOL!

  ----------------
Now to the deck.  Finally, the end!  Well, sort of.  On Monday, some guys will be coming back to take away all the debris, fill the patio holes with more cement and apply a professionally smooth surface to match the existing patio as close as possible,  and smooth out all the remaining dug-up soil.  But the deck is essentially done.

First thing yesterday morning, they finished putting the composite board on the deck.  Then started putting on the rail support posts.   It looks great.  Now there is a real deck!
Then the tedious part, putting the rail tops on, then all the ballisters.  Of course, they had a sensible way of doing those.  They tacked the all tops with a nail gun and them let them hang freely, then they tacked the bottoms using a level to get them aligned properly.

THEN they put a screw in the top and bottom.  I would have done it the hard way, of course.  Each ballister one top screw and one bottom, one at a time. 
The ballister work progresses...  They did gripe about my "screws" contract requirements though.   They said nails were just fine and would have saved them almost 2 hours work.  But nails always come loose and I can't think of any screws that ever have!  They accepted that (and I might have gotten a couple minor construction points for it).
They did get them all done eventually.

I seem to have missed taking pictures of them building the stairway rails and attaching the ballisters on those.  That was a right piece of hard work by itself.  And took 2 hours worth.  Lots of angle cuts and awkward positions for screwing them in.

They got done just before the rain hit and I helped hual stuff to their trucks.

But here is the final deck!  From the deck door straight out...
A shot across the corner...
The landing leading to the stairs...
A look down the stairs...
And finally, a shot from the stair-landing to the opposite corner. 
I am thrilled!  There is SO much more usable space.  I can actually put a table out there, for example.

And to remind you of the difference, here is the "before" picture (admittedly after 25 years)...
And the "After".
 Quite a difference!

Thursday, July 3, 2014

New Deck, Part 3

The deck is complete!  This is actually from yesterday, because there are too many pictures for a single post and I was just TOO DAMN TIRED to post yesterday.  So today's work will be in tomorrow's post.

The construction team was just 2 guys - JR and JT.   First order of work was to remove the old ledger board (holds the deck to the house foundation), cut away vinyl siding, and attach "flashing" to the house (keeps rain out).
Then a new bigger ledger board was attached.  I was surprised.  They used bolts closer than I did on the original deck and all my friends accuse me of "over-engineering"  everything I build.  Seriously, I always figure "if 2 screws are good, 3 are better".
What they did next, though, REALLY astonished me.  I build from the ground up.  Who doesn't?  Well, these guys don't, that's who!  They built the basic shape of the deck floor up in the air, supported at the corners of the ledger board and just 2 temporary boards.

I asked why (that's why I stayed outside for 2 whole days - to learn things).  They do it because it is easy to slightly adjust the deck floor box square when it is still flexible.  After the support posts are in cemtny, there's no changing things!

Forehead slap!  Of course.  And because we had talked a little carpentry, they asked if I knew how to make sure the box was square.  I said "sure, measure the diagonals".  I got a "high-five" (and a little casual respect) for that one!
But not even the professionals are perfect!  When they started to put the joists between the ledger board and the end cap, they were too tight.  I pointed out that the end cap was bowing out so their measurements were wrong.  They scratched their heads for a moment and had an "OOPS" moment.

See, the outside measurements of the deck box have to be 16' exactly.  So the senior guy (JR) had of course deducted the thickness of the end cap when he cut the joists to fit inside the box.  But forgot to deduct the thickness of the ledger board!  LOL!  Oh did he catch flak for THAT from JT.  And I got in a couple of friendly-kidding remarks later about that, which he took in good humour.

So after recutting all the joists anther 1.5" shorter, they were back in business.  Then I saaw a new surprise!  There are metal hangers to hold the joists to the ledger board and endcap.  Naturally, I would think you would attach the hangers to those and then set the joists down onto the hangers.  OF COURSE NOT!   They used a nail gun to hold the joists in place and then put the hangers under those tightly.  This is all contrary to my basic understanding of construction (and gravity, for that matter), but that's why THEY are building the deck and not me.  Me - 2 decks, Them - 200+, they weren't sure.

So here are most of the joists in place (I had to keep reminding myself; take pictures, take pictures).
THEN they put in the support posts.   I was getting the logic of it by then.  You only know where the posts and beams go when you REALLY know where the interior corners of the deck box are so you can push the posts up from below, put carriage bolts into the posts and beams, and THEN pour the cement into the holes to support!

The corner of my brain where my "Learned From Dad" experiences reside are all screaming "this is all bass-ackwards", but what I'm observing says "outside your box, watch and learn"!  So I shushed the Dad Corner and learned...
So here is a "support" post hung from the deck box, with cement poured into the hole.  Then when the cement hardens, it all flips around and the posts supprt the beams, which support the deck box, etc.  I'm still stunned.
This is the COOLEST gadget I don't own!  It clamps across a deck board, spaces the boards apart evenly 1/4".  Then you set a screw in the front and back holes (which are at angles), and drive them in!  The spacing is perfect every time and the screws are invisible.  Oh MAN, I love well-designed tools.

I also loved the screws.  In the old days, there were just straight-slot screw-heads.  Then there were   Phillip-Heads (an X).  Then there were square heads (which I use myself), then star-shaped and even "tork" which has 7 or 8 sides.  All the harder to slip the driver of the screw.  The guys use star heads.  But it this gaget that makes things so much easier.
Finally (yesterday), they attached the stair tread supports.  I am vaguely bothered by the deep cutouts on these pre-made stair hangers.  They just seem like they could break where the board is narrow.  When I built my steps on the old deck, I used solid 2"x12" boards and supported the treads on cleats attached with 1'2" bolts.  But I have to admit that 4 of those pre-made forms adds a lot of strength.

Still, I may add "sisters" (additional boards screwed to the sides of the preforms) the later. But 4 of those only a foot apart does look pretty sturdy.
Tomorrow, the completion!

Tuesday, July 1, 2014

New Deck, Part 2

What a couple of days!  Pictures at the end as a reward to those who read this whole chapter (or you can just skip down, LOL).

YESTERDAY: 

First, the foreman of the team that will actually build the deck was to arrive between 7 and 8 am to mark the spots for the posts.  I had barely gotten dressed (and all that routine morning stuff) when the doorbell rang promptly at 7.  I was shocked, but pleased not to have to wait.

The first surprise was that he went to mark a spot on my patio.  I stopped him to ask "why so close to the ledger board"?  Ledger board is a support attached to the house to support joists.  Turns out that ledger boards are no longer used so that decks are technically "free-standing".  Why?  So that if the house falls down while people are on the deck, they will be safe.

WHAT?  Well, it's The County Code and you can't argue with it.  That was my first big laugh of the day. 

So he sprayed an orange paint X on one spot and measured 6' further and was about to paint another X when I stopped him again.  "Thats directly in front on the sliding glass door.  I won't be able to move anything in or out of the basement.  Safety exit, too".  So he called someone and told me it can be 8'.  Just past the door.  OK, but 2nd big laugh of the day.

Then he went to where the posts had to go in the lawn.  I thought those were fine, so "no comment".  If it seems like I watch contractors carefully, you're right!  They do the damndest silly things sometimes.  I learned a lot from when the house was built almost 28 years ago.  I lived 60 miles away, so I visited every weekend to see how things were going.  Afterwards, I wished I had set up a big tent in the backyard and just lived there for 6 months so I could check on things every evening.  Utterly impractical of course, but I would have had a better house.

So then the guy tells me the hole digging team would be there "After Noon".  Not "This Afternoon", "After Noon".  They arrived at 3 pm.  But they said it would only take 2 hours to "punch out" the holes.  Fine.  They had a gas-powered auger and some 5' breaker bars (aka crowbars) and a post hole digger, and the 2 guys looked like former football players.  I figured there would be no problem.

The first 2 holes in the soil near the house went fine, about 30 minutes each.  The holes have to be 2' square and 2' deep.  The hole inspector (yes, the County must approve the holes for the main posts - "Code").

The 3 lawn holes farther from the house were a different matter.  After the 4" of topsoil I'm built up over the years, they hit rock-hard clay and sand that their auger would not dig into.  They were "upset" (If I could understand most of what they were saying, I probably would have learned some VERY interesting new phrases *Coff, Coff*). 

They alternated between hand and power tools after that, completed 1 and 1/2 of the 3 farther holes by quitting time (5 pm on the dot).  I pointed out that the hole inspector was scheduled to arrive between 9 and 10 am the next morning.  I thought that was cutting it close...

But just before they left, they drew a 2' square around the 2 painted Xs on the cement patio.  So I asked about that.  "THAT" led to my third big laugh of the day.  They have to cut holes in the cement to make holes just like in the lawn!  "Why can't you just put the posts on the cement patio"?  "CODE" again!

Apparently, they have a huge circular saw that cuts "right through" cement, but not to worry, the soil under the patio was certain to be looser and would "take no time".  And they would be back at 7 am "plenty of time".

So it took them 2 hours to dig 1.5 of the 3 farther lawn holes.  Then it should take them another 2 hours to dig the remaining 1.5 lawn holes.  AND they had to cut through a cement patio, bust of the cement, remove it, and dig 2 more 2' deep holes in the dirt underneath in then "zero  to 1 hours time" depending on when the inspector arrived.

I apologize for the length of this, but more will be happening tomorrow, so I need to get through "yesterday and today" now.

TODAY:

One digger arrived promptly a 7 am.  One thing I will say is that these people ARE punctual!  He went right to work struggling to auger, chop, and dig his way to the 2' depth required.  With no better success than yesterday!  The other guy arrived at 8 with a helper.  And while one guy and the helper went at the lawn holes, the other guy went at the cement patio with the huge circular saw. 

OK, progress...

The contractor himself showed up at 8:30 am to make sure the holes were finished pre-inspection.  What a surprise he had!  He watched them work and than looked at his watch.  I casually mentioned that there was no chance of them finishing the holes before 11 am at best.

So the inspector arrived at 9:15.  Failed them, of course.  Rescheduled for tomorrow morning.

It took til Noon before they got all the holes "done".  They just disappeared while I was in the house.  I measured all the holes, and they were at 22", not 2" full feet.  I hope they don't get failed again and need a 3rd inspection Thursday morning.  The deck will take 2 days to build, and it hadn't occured to me that Friday is the Independence day holiday, they don't work on weekends and that would mean until Monday before the new deck is finished!

Now, for some pictures and comments:

One of the Big Red Xs.
And on the cement patio.  Little did I realize that meant cutting into the cement.  I assumed at first it was just for post anchor bolts.
The auger they used for drilling holes in the soil.  Carefully cropped for my more sensitive readers.   The guy on the right had his pants and underpants halfway his butt most of the time.  There is a REASON that careless fat guys should wear suspenders!
One of the lawn holes they dug.
Cutting the square hole in the cement patio was dusty work.  I offerred him a workshop dust mask, but he declined.
Their assumption was that the cut cement would be easily broken up with a sledgehammer.  RIIIGHT!  They had to get a jackhammer.  And that took them forever.
They finally managed to complete all the post holes.  
All this, and the actual building of the deck is yet to start.  This preparatory rough work is (finally I hope) OK.  But the work I care about is the new construction.  I bet I experience more "fun" while that goes on tomorrow and Thursday.




Sunday, June 29, 2014

Another Good Workout In The Yard

While I'm waiting for The Next Step on the new deck (Monday), I spent almost all day outside.  No one particular project, but a little of everything.

First was watering the plants.  We've had more rain than average since last Fall, but it hasn't rained much for 2 weeks, so that was a priority.  I built a tripod watering stand a few years ago and improved it last Fall (changed the nozzle from a shower wand type to a fan type) and used it today.  Much better coverage in my long but narrow beds.  I use a cheap digital kitchen timer than resets to the previous time after running down.  Great for repetitive waterings as I move the tripod along the beds.  The fan spreads out about 9' wide and 6'deep, which is perfect.

And in each 6 minute I can do other things until the timer beeps in my pocket.  I had noticed poison ivy under the old deck after it was removed, so I dug that up.  That took one watering spot cycle.  On the next, I started cutting down junk tree saplings .

I should explain that.  I've left some of the back yard "wildish".  Meaning its not lawn, but not "woods" either.  Its awkward to mow, so ivy, native vines and trees keep trying to grow there.  After the deck is done, I think I will arrange to have it leveled.  I don't mind the ridge itself, but it is a never-ending source of weed-seeds that find their way into my flowerbeds. 

I don't love great expanses of lawn (I never saw much lawn I didn't want to plant something more interesting in), but if I could use the riding lawn mower to keep the brush down, that would be nice.

Anyone want to take away 1200 square feet of very healthy english ivy?  Free? 

But for now, I was just cutting down the 3" to 5' unwanted tree saplings.  I cut them down 2 years ago and applied Roundup to the stumps.  I think most of those died, but there are always new ones ready to take their place.  So I would like to end that cycle. 

Then after the timed watering cycles were done, there were individual spots that needed hand-held watering.  That took a half hour, but I was in the shade by then and it wasn't too bad.  Plus there was a Washington Nationals baseball game on the radio and they were winning.

Not to say that I didn't stop each hour for 15 minutes inside to cool down and relax a bit...

I finished the day with the boat.  Its not much of a boat.  Its a 16' aluminum shell jon boat that I haven't used for 5 years.  It was full of leaves.  But one of the crew that demolished the deck Friday expressed an interest in buying it as he was about to retire and just wanted a small boat he could fish from.  Said he had always wanted a small boat but couldn't afford one.

I suggested that, if I cleaned it up, I could get $1,000 (with the trailer).  He offerred $500, as is.  And I have to admit the "as is" was not very impressive.  It was full of leaves and there was even a plant growing up from the leaf compost.  And "as is" meant it might even leak.

I'm a softy.  I agreed to $600  "as is".  He said he would come by next week.

Well Gee, I couldn't just let the boat be driven away with leaves blowing out of it, so I decided to scrape them out.  And then old habits of cleaning the boat out took over.  After 21 years, I know the ins and outs of cleaning this boat, so I just did it!  Wearing heavy rubber gloves and using a wide push-broom, I went after the leaves.  And in a selfish sense, I coveted the 1" thick layer of leaf-compost covering the inside.

So I scooped it all out as best I could.  Well, after that, it seemed only reasonable to use a hose on "jet" to beat off the remaining debris off the floors.  Then there was all the planty debris floating around inside and I decided to remove that as best I could.

It became "A Project"!

I ended up cleaning the boat.  I don't mean scrubbing the benches and floors to get rid on mold or mildew.  But in a macro sense, I cleaned the boat.  Wearing rubber gloves, I scooped out all the large debris and powered the smaller remaining compost to the back where there is a drain hole.  That got clogged a lot, so I found a bit of tree branch that fit the hole and unblocked it frequently.

All the while, listening to the baseball game then classic music while having a couple beers.  I was actually enjoying cleaning the boat!  Until...

In the middle bench, there is fillable compartment for keeping bait or storing caught fish.  When I opened the hinged lid on the top, a wasp flew out.  I have a bad history with wasps.  I ran half the yard away until I could see it left the area (yes, I'm far-sighted, I could see the wasp 20 yards away).

When I got close again, I saw there were wasp nests all around the inside of the bait well.  I don't like to use poisons, but I cannot work around wasps or hornets.  So I searched deep into my under-the-kitchen-sink-cabinet and found some wasp spray.  I committed waspicide...

Even with heavy rubber gloves, I was twitchy about picking off the wasp nests and stomping on them.  Please know that I understand wasps are beneficial and I try to leave them alone.  They are good for my gardens.  But they can be in the wrong place at the wrong time.

Can you imagine what might have happened to the guy who is buying the boat and after driving the boat for miles opened that bait door cover?  The wasps would have been in a REALLY bad mood. 

So I killed the wasps and gingerly poking around in the bait well, found the drainage hole.  It took a while to get myself to pick out the dead wasps and nests blocking the drainage hole, but I did it.  And got the bait well cleaned and draining free.

Then I realized there is another great place for wasp nests under the raised area at the front of the boat, so I sprayed into there too.  

So much for wasps...

After having pretty much gotten rid of all reachable leaf debris, I needed to know if the boat leacked.  After 5 unused years, who knows.  So I propped up a shovel under one side of the boat to make it perfectly level from port to stern (sideways).  Then I lowered the front so that water would fill it up evenly stem to stern (front to back).

That took a half hour, while I went around the yard digging up all the poison ivy plants I could find.

Finally, I got it up to an exact point toward the front I can use as a guide.  If the water level in the boat drops any below that (and after 6 hours it hasn't) and if I see no drips from the boat, I know it is still waterproof.

The guy buying the boat is getting a real deal.  Did I mention that aluminum Jon boats have only a 1/16th thick aluminum shell and bottom?  Well, I bought 3/32nds aluminum plate to put on top of that.  Over a cover of outdoor carpet to deaden the sounds transmitted through metal as you fish?  And more outdoor carpet on the top of the aluminum plate so it doesn't get hot in the Summer?

But so am I (getting a good deal).  What value is something you have stopped using?  I'm going to get another boat soon.  It might be a smaller Jon boat (easier to manage as one person).  Or It might be a fancier one I can take out on Potomac River waters.  I'll decide that after I am rid of the old one which is neither.

And I had a WONDERFUL time working outside today!



Friday, June 27, 2014

New Deck, Part 1

I finally decided to have the 24 year old 2-level deck replaced.  Even pressure-treated wood doesn't last forever.  I had gotten estimates last Fall, but put off doing anything while I decided whether or not to rebuild it myself.  After all, I built the original, 200' of 6' tall fence, a toolshed, and framed raised beds.  But on my birthday in May, I concluded that:
1 - I'm not 40 any more
2 - I can do rough carpentry but not nice design work
3 - After treating the house to new siding and shingles, why build another ugly (but functional) deck
4 - I could afford to have it done by professionals

So  yesterday, I removed everything from the decks, and closed the container plants (lillies and caladiums -bad for cats) in the catroom.  This morning, I closed the cats in the bedroom,  and the people arrived to tear down the old and put up the new.

Well almost.  I knew they would do the demolition today and build the new deck Monday.  Except I didn't quite ask the right questions about the schedule.  They will START building the new deck Monday.  Monday is for digging holes and laying in footers for the posts to rest on (the old upper deck was 12'x12', the new one will be 16'x16' and there will be no lower deck).  Tuesday will be for the County to approve the footers.  Then on Wednesday and Thursday and possibly Friday they will actually build the new deck.

The cats are horrified and I'm not thrilled either.  I thought they would simply build the entire new deck.  It only took ME a week to build the existing one by myself!  Oh well, "this too shall pass"...

While I'll put together a whole demolition-to-completion post at the end of the project, here are a few demolition pictures:

The original, with all the furniture and stuff removed.
The demolition begins.
Down to the joists.
Nearly gone.
It all fit into 1 trailer.
And the demolition is complete!  And BTW, for some reason, the new green siding always looks blue in my photos.  The old ledger board is left in place for now to keep hot air and wasps from getting into the basement through the bolt holes.
I sure hope it doesn't rain next week to delay things further!

A Day Late

But I wanted to remember a sad day. I remember some parts.  I was only 13.  I saw a lot on TV afterwards.  But my most specific image is the...