So, he first thing they did was start puting new soffit on the undersides of the eaves.
I was surprised at how much work was involved.  They did more than the original builder did!  They added anchor strips and checked for it being level in all 3 directions.  I enjoyed listening to them calling the measurements down to the guy doing the cutting.  "5 4 3" is 5 feet 4 and 3/8 inches.  No wasted words, LOL!

The results looked great!  (This is before they screwed the outside edge to the bottom of the overhang).  But I don't have a good picture of that.